We have plenty to do at MLT and could use some help if anyone would like to donate some time on ANY one of these details please call Bob at 276-340-9144 anytime.
Trail work that needs to be completed
- Level Field trail below house, cut off grass
- Berm at corner field loop downhill at fence corner
- Jump after corner
- 1 or 2 jumps down to spring house downhill
- Small berm on corner at spring house downhill at spring house
- Take out last woopty do at hill before cox loop
- fix/bem/turn top of cox loop hill
- fix 6 berms cox loop add jumps
- berm at end of top laurel loop top trail
- loop out into woods across 4 wheeler trail top loop laurel trail
- finish second laurel switchback, add loops, jumps
- berm turn at bottom before crossing spring up to Berndie Hill
- 3 berms at end of Berndie hill and start of creek loop
- Iron loop re route after creek trail rock garden east side trail.
- Cut down hill from creek trail to cabin
- Finish 3 berms on club moss trail on the way back up to the trail head
- Detect best way to cross creek to start on the east side 60 acres