One of 2 bridges were installed Saturday over Jennings Creek to access the back 65 acres. First bridge is 18″ long and crosses the “swimming hole” area to the north side of the new outer loop trail. Second bridge will be installed this week and it will be 26′ long and cross Jennings Creek above the ATV ford.
If anyone has any time to donate this week we could sure use it. We are preparing for the Spencer Penn Pig Ride this weekend. Please call 340-9144